Home › FAQ

Frequently Asked Questions About Parking Lot Striping

Answers to the most common questions property managers, business owners, and HOAs ask about parking lot striping, ADA compliance, fire lane painting, and pavement marking in Kansas and Missouri.

CATEGORY 01  ·  PRICING & SCHEDULING

Pricing & Scheduling

How much does parking lot striping cost in Kansas and Missouri?

Parking lot striping costs vary based on lot size, number of stalls, services required, and surface condition. Because every property is different, we provide free on-site estimates so you get an accurate price for your specific lot. Most commercial restripes are priced per stall or per linear foot. Call us at (913) 238-4008 or submit our online form for a no-obligation quote.

How long does a parking lot striping job take?

Most standard commercial lots are completed in 2–6 hours. Small lots under 20 stalls can often be done in 1–2 hours. Larger properties or complex layouts including ADA compliance painting, fire lane marking, and stenciling may take 4–8 hours. We give you a time estimate before we start so you can plan accordingly.

Can you stripe my parking lot while it’s still in use?

Yes. We regularly work in sections on active lots — painting one area while vehicles use the rest, then rotating through. We also offer early morning, after-hours, and weekend scheduling. We’ll coordinate with you to find the approach that causes the least disruption to your tenants, customers, or residents.

Do you work with property managers who have multiple locations?

Absolutely — multi-property portfolio work is something we actively welcome. We can set up scheduled maintenance programs across multiple sites, providing consistent pricing, predictable timing, and a single point of contact for your whole portfolio. Call us to discuss how we can structure a program that fits your needs.

CATEGORY 02  ·  ADA COMPLIANCE

ADA Compliance

How many ADA accessible parking spaces does my property require?

The required number of accessible spaces scales with your total lot capacity per the U.S. Access Board ADA Parking Guidelines and 2010 ADA Standards for Accessible Design:

1–25 total spaces → 1 accessible required
26–50 spaces → 2 required
51–75 spaces → 3 required
76–100 spaces → 4 required
101–150 spaces → 5 required
151–200 spaces → 6 required

At least 1 in every 6 accessible spaces must be van-accessible. We assess your layout and bring it into full compliance.

What are the exact dimensions for ADA accessible parking stalls?

Standard accessible stalls must be at least 8 feet wide with a 5-foot access aisle alongside. Van-accessible stalls must be at least 11 feet wide with a 5-foot access aisle, or 8 feet wide with an 8-foot access aisle. Access aisles must be marked with cross-hatching and the “NO PARKING” designation, and must be level (maximum 2% slope in any direction).

What happens if my parking lot isn’t ADA compliant?

Non-compliant accessible parking exposes your property to federal enforcement under ADA Title III, including complaints to the U.S. Department of Justice and private lawsuits. Penalties and remediation costs can far exceed the cost of compliance. Johnson County and Kansas City inspectors also cite faded or missing ADA markings during routine commercial property inspections.

CATEGORY 03  ·  FIRE LANES

Fire Lanes

What are the fire lane marking requirements in Kansas and Missouri?

Fire lane requirements are governed by local fire marshals under NFPA 1 Fire Code. The minimum unobstructed fire lane width is 20 feet. Curbs within fire lanes must be painted red, and “NO PARKING — FIRE LANE” stenciling must be applied at regular intervals. Specific requirements vary by jurisdiction — Johnson County, Overland Park, Olathe, and Kansas City each have their own AHJ (Authority Having Jurisdiction) standards. We paint to your jurisdiction’s specific requirements and document the completed work.

How often do fire lane markings need to be repainted?

In the Kansas City area, we generally recommend inspecting fire lane markings annually and repainting every 1–2 years. Snow plowing, road salt, and freeze-thaw cycles wear down red curb paint quickly. Faded fire lane markings are one of the most common citations issued during commercial property inspections in Johnson County. Don’t wait for an inspection to discover the problem — proactive maintenance costs far less than a correction order.

CATEGORY 04  ·  PAINT & DURABILITY

Paint & Durability

How long does parking lot striping last in Kansas City’s climate?

Quality traffic-grade parking lot paint typically lasts 1–3 years in the Kansas City metro depending on traffic volume, sun exposure, and the severity of freeze-thaw cycles that season. High-traffic lots (retail, restaurants, warehouses) often see noticeable fading within 12–18 months. Lower-traffic properties like office parks or HOAs may go 2–3 years. We use professional-grade traffic paint designed to withstand KC’s climate extremes and recommend proactive restriping before lines disappear completely.

How soon can vehicles drive on freshly painted lines?

Traffic-grade paint dries to the touch in approximately 30 minutes under normal conditions (65–85°F, low humidity). We recommend keeping vehicles off freshly painted areas for at least 30–60 minutes. In cooler temperatures or high humidity — common in Kansas City spring and fall — drying can take longer. We’ll advise you on timing specific to the day’s conditions before we leave the site.

When should I restripe versus doing a complete new layout?

A restripe is appropriate when your lines are faded but the current stall configuration still works well for your property. A new layout is the right call when you’ve had the lot repaved, when you want to reconfigure stalls to improve capacity or traffic flow, when your current layout doesn’t meet ADA requirements, or when old layout lines bleed through and create confusion. A new layout can often accommodate 10–15% more vehicles than a poorly designed original — we assess your lot during the free estimate and recommend the right approach.

CATEGORY 05  ·  OUR SERVICES

Our Services

What services does Stars and Striping LLC provide?

Stars and Striping LLC provides a full range of exterior pavement marking services including: parking lot line striping (new layouts and restripes), ADA compliance painting (accessible and van-accessible stalls, access aisles, ISA stenciling), fire lane painting (red curb painting and NO PARKING stenciling), custom and standard pavement stenciling (arrows, reserved, speed limits, loading zones), bollard painting (safety-yellow with optional reflective banding), and light pole base painting. See our full services page for detailed descriptions of each.

What cities do you serve?

We serve 18 communities across Kansas and Missouri. In Kansas: Overland Park, Olathe, Shawnee, Lenexa, Mission, Mission Hills, Fairway, Gardner, Edgerton, New Century, Kansas City, Lawrence, and Wichita. In Missouri: Kansas City, Lee’s Summit, Blue Springs, Grain Valley, and Greenwood. See our service areas page for details. If your city isn’t listed, call us — we may still be able to help.

Is Stars and Striping LLC licensed and insured?

Yes. Stars and Striping LLC is a professionally operated business based in Overland Park, KS, carrying commercial insurance for all pavement marking and painting work. You can verify us independently via our Google Business Profile, where you can also read reviews from properties we’ve served across the Kansas City metro.

What is your satisfaction guarantee?

Every job we do is backed by a 100% Satisfaction Guarantee. If the completed markings do not match the agreed scope and specifications, we return to correct the work at no additional charge. We stand behind our work on every property, in every city we serve.

Get Your Free Estimate for Any Service

Tell us about your property and the services you need. We’ll respond within one business day with a no-obligation quote.

Still Have Questions?

Call us directly or submit your project details online. Estimates are always free and we respond within one business day.